Talk:Tilting train

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

How much faster?[edit]

Could someone tell the audience how much faster tilting trains are, compared to non-tilting trains? In Sweden, the theoretical difference is only 15% (not upt to 40%, as mentioned repediately).

// —Preceding unsigned comment added by 80.216.36.210 (talk) 21:34, 15 March 2009 (UTC)[reply]


Active tilting mechanisms are interesting, but I don't know how they actually work. One report I read suggested that something like a standard spirit level is used, and optical detectors are used to determine where the bubble is. In a train at rest, and not tilting, the bubble should be in the middle of the gauge. If a train travels round a corner without tilting, the bubble will move, so feedback can be used to recentre the bubble - by tilting the carriage body.

I have no idea whether this mechanism is the one actually used. Additionally, if this is the kind of mechanism used, being a feedback mechanism, it would require a disturbance before acting, and there would also be the possibility of oscillations, which might be worse than the original problem - at least from the passengers' point of view.

In the Bombardier LRC, an accelerometer senses when the coach starts to turn by the measure of centrifugal force. This is inputed into a feedback loop, say a PID loop. The output signal actuates side hydraulic cylinders. Very simple to design from a mechanism point of view and very easy to control. The LRC are still is use as of today. (Laurentien 23:15, 3 September 2007 (UTC))[reply]

More sophisticated systems could use predictive or open loop control mechanisms as well as feed back systems, to start to tilt the train body as it enters a curve. Again, I've no idea whether this is done on any trains.

There is evidence that active tilting allows trains to run faster, and arguably reduces maintenance costs, while also improving (or at least not worsening!) passenger comfort.

Passive tilting appears to have no beneficial effect on the speed of the train, but may improve passenger comfort. David Martland 09:00, 1 Apr 2004 (UTC)

Passive tilting is used on all talgo pendulars and do help in the corners exactly the same as when you tilt when using you bicycle. The UAC Turbo-train also had their own type, in fact they made the first commercial passive one.(Laurentien 23:15, 3 September 2007 (UTC))[reply]

As I now added to the article, tilting trains traditionally used gyroscope sensors and an electronically controlled servo system. They were not perfect and they did cause nausea. Modern trains have Digital signal processors to read the track ahead and perfectly anticipate the required tilting action.

Details are very sketchy. The truth is that all the high speed tilting trains in use today are developed by the Italian Pendolino group, who also purchased the APT project when it flopped (I suspect in part that the did this to stop the technology falling into other hands). The Pendolino group was part of Fiat Ferrovia, which is now owned by Alstom but the Pendolino crew are still the same old people in the same old R&D departments, and they seem to keep very quiet about details....even history.

Here is mistake. Bombardier makes the tilting systems for the ICE-3 in Germany, Talgo 350 is Spain, Acela Express in the USA, Super Voyagers in the UK and the new Swiss InterCity Neigezug. They actually built more than the italians. Bombardier also owns the rights on the ABB X2000. (Laurentien 23:15, 3 September 2007 (UTC))[reply]

I have found that there is little detail and a lot of contradiction in the details about tilting trains. I am trying to find out more about the tilting mechanisms and the nausea problem and will probably add a "nausea" section to this page if I can get to the heart of the issue :-) There is no doubt that nausea has played a big role in the failure or at least bad publicity of many tilting train projects, and yet curiously the early and simple ETR 401 apparently did not suffer from this problem, indeed it remained in regular service till the end of the 90's being used primarily for "holiday charter" trains from the industrial north down to the south, and AFAIK is still not withdrawn. -- Roger Irwin 22:27, 21 Sep 2004 (UTC)

In Switzerland, the ETR Cisalpino have had a bad reputation for nausea. I have taken them a few times and realized that the control law was of first order: a linear function. (Laurentien 23:15, 3 September 2007 (UTC))[reply]

BART trains had the first active tilting system, with the prototype cars in 1970. Each of the original cars sits on a triangular frame using three air bags, with inflation under electronic (probably analog) control. But I don't have a good cite for this. --John Nagle 04:25, 2 April 2006 (UTC)[reply]


I'd like to straighten out a few points here, especially with regard to the BR APT Project. In the 1970s I was the Tilt System Development Engineer for the APT-E, the gas turbine powered Experimental non-passenger carrying train, and also carried out some system development work on the APT-P, the 25 kV electric passenger carrying trains that entered service in the 1980s.

Firstly the APT did not follow the HST project, they were on-going at the same time, and indeed HST benefited from the advanced wheel-rail technology from which sprung the APT. The APT was seen as a relatively long term project whereas the HST was seen as a shorter term solution to specific problems on the Western and North Eastern regions with their relatively straight main lines compared to the heavily curved West Coast Main line, which was the prime target of the APT project.

APT-E used an electro servo-hydraulic tilt system, of which the primary sensors were servo-accelerometers mounted on the centre line of each vehicle. These fed an analogue control system which in turn fed a servo-valve feeding pairs of vertically mounted hydraulic actuators at each end of the respective vehicle. The system was duplicated from the sensors down to the servo-valves and overall tilt performance was monitored by a spirit-level type sensor which switched control channels from the active to the stand-by channel if it detected lateral accelerations outside previously set limits. Each vehicle had it's own self contained hydraulic power supply mounted above floor level for development and maintenance purposes and these were powered by the train's 415 VAC system from an APU in each power car. (Originally this was one of the five gas turbines in each power car but later a diesel APU was fitted to free the fifth turbine for traction purposes)

The APT-E tilt system was inherantly unstable in that the vehicle would fall over onto it's bump stops (which were inside the tilt actuators) if the tilt system hydraulic pressure failed or a control system malfunction occured. This was a nominal maximum of some 9 degrees in each direction with a mechanical limit of 12 degrees. In this situation no part of the vehicle would foul the loading gauge, the 'hole' through which the train passed while running on the line and past lineside structures due to the tapered cross section of the vehicle bodies. Steps were taken during the test programme to minimise the consequences of such a failure by fitting various modifications to the system, culminating in hydraulic limiting valves fitted to the bogies which closed off the flow to the actuators.

Various different control systems were tried on APT-E but at all times during it's relatively short life the vehicles had separate tilt systems. No cascading controls were fitted, where one vehicle sent it's tilt sensing signals to the vehicle trailing it, however some tests were made with evaluating the use of such sigals in case of a failure.

APT-P similarly used an electro servo-hydraulic tilt system, but with the hydraulic power supply, control system and associated pipework all fitted under the floor of the vehicle in a removable crate. APT-P used horizontally mounted tilt actuators of considerably longer stroke because the system geometry was changed to make it more stable in the failure case. However this limited the ultimate tilt rate that was possible and I believe that APT-E had the highest performance tilt system ever built anywhere, despite it's obvious lack of sophistication and it's subsequent fragility.

Contrary to many items in the press, including that of the Economist of 21st Feb. 1988, the APT-P DID go into service for much longer than the much stated 3 days. While it's true that the initial length of service was very short, it should be noted that this took place in a very cold and wintery December and the train's debut could have been better timed. Undoubtedly this timing was politically motivated but the weather was apparently not part of the considerations. I was on the inaugural soutbound run, as a real live paying passenger having left BR by then, and can attest to the severity of the conditions. The prime cause of the original withdrawal was icing of the overhead power lines which caused fluctuations in the train power, causing many other problems as a result.

Later on the train was put back into service and ran for a number of years, albeit not scheduled as such in the timetables. During this time many different tilt control systems were tried and developed on the three service trains, including some cascade controls and some predictive systems. Toward the end of the train's service I understand some trials took place with limited tilt angles to reduce the so-called 'tilt sickness' but these are undocumented in the public domain as far as I know.

Turning to non-APT tilting trains, the Canadian LRC had some considerable input from the APT project in that one of the prime engineers on the APT emigrated to Canada to join the LRC project.

On the other had it's difficult to support the statement that some aspects of the APT project were purchased by the Pendelino group. While it's possible that this took place in other areas, in the case of the tilt systems the two trains are not compatible in any way. Pendelinos use a different geometry, different control philosophy and different actuation systems. The history of this is somewhat muddied due to the various commercial changes that took place after BR was privatised.

ASEA was the group that purchased the part of BR which owned the tilt technology, and was then merged with Brown Boveri to form ABB. At some time this group developed the Swedish X2000 train which has a very similar tilt system to that used on APT-P and in the 'what goes around., comes around' scenario a similar system is used on current Virgin Super Voyager trains in the UK supplied by Bombardier, who took-over ABB, by then entitled ADtranz.

The Pendelinos, including the Virgin run Class 390 trains in the UK, on the other hand, are supplied by Alstom, who bought out Fiat Ferroviaria who developed the Pendelino concept originally. Altsom purchased the vehicle manufacturing part of BR, rather than the R&D part, as far as I've been able to discover. While the Pendelino development team may be 'the same old team', although I doubt it after this length of time, the BR team has long since been disbanded and relatively few of us are working in the same field any more.

The existence of at least two different types of tilt system in service, Pendelino and APT-P, in Europe at the present time, bears out these statements I hope.

The subject of 'tilt sickness' is often quoted as the reason why 'tilting trains don't work' but this is not universal and many people do not suffer, in the same way that some people are prone to sea sickness and some not. When on the inaugural run of the APT-P, on which I was a passenger as stated above, the start was in total darkness leaving Glasgow Central Station and it did not begin to get light until well south of Carstairs. At that time APT-P was running a control system that compensated wholly for any tilt deficiancy and under normal circumstances little or no lateral acceleration was felt during curving. The effect on that winter nmorning was that someone had straightened out the entire track south of Glasgow! I was very familair with that stretch of track and I was astonished how well it all seemed to work, after being away from tilting trains for some 2-3 years.

All this changed as the light came up, the horizon then became visible and at the very high speeds the train was running the tilt angles became all too obvious. Some of my fellow passengers did show some signs of illness, although it has to be said that the great majority of them were media and press representatives who had been entertained at BR's expense the previous night in the hotel near the station....

However others of us showed no signs of such sickness and this has been the situation ever since, some passengers feel ill and others don't. Such is human nature that only the complainants tend to get heard though, thus the myth that 'tilting trains make you sick'. Latterly tilt systems have been tuned to reduce this effect by leaving some of the required tilt for any given curve un-compensated, thus leaving the passenger with some feeling of the lateral acceleration that their eyes are telling them is required for the situation. Certainly the Swedish X2000 train that I travelled on a few years ago had such a system fitted and I'm told by members of the Virgin Pendelino development team that this is the type of system fitted to their trains.

On APT-E, with it's very high tilt rate, while almost no lateral accelerations could be felt, it was notable that seats next to the windows showed a high vertical acceleration as the vehicle rotated to it's correct tilt angle for the curve. The effect was similar to that felt in an aircraft entering a turn, a postive 'g' force pushing one down into the seat as the curve was entered, followed by a short period of negative 'g' as the circular portion of the curve was reached and the tilt angle reached a steady state, then a period of no acceleration while in the curve and then the opposite sensed acceleration periods as the curve was left.

It was found that those of us on the tilt development team could operate in two modes, one hyper-sensitive to tilt angles (to this day I can sense the angle of a surface I'm standing on to to with a degree) and one where we were totally oblivious to any surface angle. This did not make us good judges of how the systems would feel to 'Joe Passenger' and the BR Advanced Projects Division quite often used volunteer guinea pigs from the staff to report back on their feelings during test runs. My wife came into such a category more than once!

It must be remembered that these were pioneering days, no-one had done this anywhere until then and very little study had been made of such effects. Indeed, until such systems were built and put into service there was no way they could be studied, so adverse press comments could best be described as somewhat premature.

I'd welcome further comment and correspondance on this or any other associated issue.

(Regards, Kit Spackman 18:50, 1 January 2007 (UTC))[reply]

removed[edit]

There is no foolproof cure, but, if possible, try and reserve an aisle seat as the centrifugal force has a less powerful control on you and your organs and coriolis effect has less takeover on balancing systems. If this is impossible, try and refrain from consumption of food during the trip. Eating food can cause nausea, but this depends on the person and the train. As you know, everyone is somehow different, so cures vary from person to person.

(inappropriate content/tone for an encyclopaedia) Stevage 11:39, 18 April 2006 (UTC)[reply]

First Tilting Train in Service[edit]

This information about that Japanese titling train in service in 1973 will lauch a certain debate : what is the first tilting train to enter service, I mean real commercial one. Is it the UAC Turbo-Train (1972), the Talgo Pendular (1978), ETR (1975), MLW LRC (1981) ? (Laurentien 23:21, 3 September 2007 (UTC))[reply]

Japanese National Railway(JNR) start series381 tilting train commercial service at 1st OCT.1973 on the Chuuou west line as limited express Shinano. And sill now tilting car seivice is cotinueing with changing the rollingstock to series383. Saburou Ukena — Preceding unsigned comment added by 浮穴三郎 (talkcontribs) 07:29, 22 January 2012 (UTC)[reply]

Active tilting = controlled tilt system?[edit]

Judging from the description of JR Shikoku Class 2000 dmus, contained in 'Japanese Railway Technology Today' (RTRI, East JRCF, Tokyo, 2001), they have a track-data-based active tilting taking place in advance, before the train approaches a curve. They call it "controlled tilt system", though. I reckon it's exactly what active tilting is all about. This would mean Class 2000 is world's first train still in use to have active body tilt system .

On the main page, there is an error : the RENFE did not a tilting Talgo in the 60´s. I want that removed or give us a valid source of information to back this up. —Preceding unsigned comment added by 144.122.157.228 (talk) 08:05, 14 October 2008 (UTC)[reply]

83.10.248.237 19:03, 13 November 2007 (UTC)[reply]

Image copyright problem with Image:Turbo Train, Montreal, 1973.jpg[edit]

The image Image:Turbo Train, Montreal, 1973.jpg is used in this article under a claim of fair use, but it does not have an adequate explanation for why it meets the requirements for such images when used here. In particular, for each page the image is used on, it must have an explanation linking to that page which explains why it needs to be used on that page. Please check

  • That there is a non-free use rationale on the image's description page for the use in this article.
  • That this article is linked to from the image description page.

This is an automated notice by FairuseBot. For assistance on the image use policy, see Wikipedia:Media copyright questions. --19:13, 2 November 2008 (UTC)[reply]

Tilting trains around the world[edit]

The "Tilting trains around the world" section is a long bulleted list that is only likely to get longer, and I seem to think that these are deprecated around here. I think it should be used to start a Template:Tilting trains, rather in the manner of Template:High-speed rail. Please also note that there is a table at High speed tilting train, which I am suggesting (at Talk:High speed tilting train) should be merged in with these above two templates. Tim PF (talk) 14:45, 14 March 2011 (UTC)[reply]

The template sounds like a good idea - please feel free to make it.83.100.238.86 (talk) 21:17, 6 January 2012 (UTC)[reply]

APT section needs rewriting[edit]

This section has too much (nationalistic) commentary. It needs rewriting. These sentences are especially annoying: "British railways, an industry that from its quantum leap in innovative technology in the Victorian times, had advanced at a snail's pace ever since" "Ironically, Pendolino export active tilting trains to the UK, the country that invented the active tilting train." "The British Rail engineers, who had little to no involvement in the development of the train, changed some of the prime and proven engineering aspects. Such as, changing the active tilt mechanism to air rather than the developed and proven hydraulics." 89.201.134.160 (talk) 10:32, 26 May 2011 (UTC)[reply]

Moreover, the most of the tilting train in use today are equipped with bogies developed for the Fiat ETR450 Pendolino, not the APT. The patent went to Alstom in the 1990s, and Alstom bogies today equip about tree every four tilting trains in service... --Jollyroger (talk) 13:03, 7 September 2011 (UTC)[reply]

I'd agree that the APT section on the main page needs re-writing and contains at least one major error. The statement that '...Such as, changing the active tilt mechanism to air rather than the developed and proven hydraulics....' is total rubbish. The APT-P tilt system retained the high pressure hydraulics used on the gas turbine APT-E, the preceding POP Train and on Laboratory 4, the test vehicle used to prove the APT-P tilt system configuration. Indeed, there was never any plan to switch to a pneumatic tilt system, the response rate was nowhere near fast enough for the WCML curves.

While I agree that there are many more Alsthom/Pendelino type bogies in service on tilting trains, the issue of the patent is an irrelevance. The facts are that the BR developed system was built, commissioned and ran first. I know because I did it.........

Regards, Kit Spackman (talk) 19:30, 21 May 2015 (UTC)[reply]

I agree that this section is not written well, it left a very bad impression on me when I was reading it (even though some of the above problems have already been fixed). I can not check the factual correctness of the article, but I took the liberty of removing one more sentence that made the tone completely unencyclopedic (i..e, "This was another British innovation that was left to others to widely implement."). I am writing this comment onboard a RABDe 500 tilting train by the way :)

Anarkigr (talk) 07:25, 28 October 2017 (UTC)[reply]

Blacklisted Links Found on the Main Page[edit]

Cyberbot II has detected that page contains external links that have either been globally or locally blacklisted. Links tend to be blacklisted because they have a history of being spammed, or are highly innappropriate for Wikipedia. This, however, doesn't necessarily mean it's spam, or not a good link. If the link is a good link, you may wish to request whitelisting by going to the request page for whitelisting. If you feel the link being caught by the blacklist is a false positive, or no longer needed on the blacklist, you may request the regex be removed or altered at the blacklist request page. If the link is blacklisted globally and you feel the above applies you may request to whitelist it using the before mentioned request page, or request its removal, or alteration, at the request page on meta. When requesting whitelisting, be sure to supply the link to be whitelisted and wrap the link in nowiki tags. The whitelisting process can take its time so once a request has been filled out, you may set the invisible parameter on the tag to true. Please be aware that the bot will replace removed tags, and will remove misplaced tags regularly.

Below is a list of links that were found on the main page:

  • http://www.railway-technology.com/projects/queensland/
    Triggered by \brailway-technology\.com\b on the local blacklist
  • http://www.railway-technology.com/projects/italy/
    Triggered by \brailway-technology\.com\b on the local blacklist

If you would like me to provide more information on the talk page, contact User:Cyberpower678 and ask him to program me with more info.

From your friendly hard working bot.—cyberbot II NotifyOnline 10:27, 3 April 2014 (UTC)[reply]

Assessment comment[edit]

The comment(s) below were originally left at Talk:Tilting train/Comments, and are posted here for posterity. Following several discussions in past years, these subpages are now deprecated. The comments may be irrelevant or outdated; if so, please feel free to remove this section.

Needs references

Last edited at 16:11, 5 October 2006 (UTC). Substituted at 08:46, 30 April 2016 (UTC)